January is planning season. If new windows are on the list for this year, a little strategy now means better pricing, better scheduling, and no surprises. Here is how we walk our customers through it.
Not every window needs replacing at once. Sort yours into three buckets: failing (fogged glass, rot, will not lock, always drafty), tired (functional but inefficient), and fine. The failing list is this year’s project; the tired list can be phase two.

Replacing in phases? Do it by side of the house rather than one window here and there — it keeps the exterior looking uniform and makes each installation trip efficient. Most customers start with the weather side (west and north here) or the rooms they live in most.
Windows are made to order — typical lead time runs several weeks from final measure to install. Planning in January and February means your project is scheduled before the spring rush, and yes, we install year-round (see next month’s post on winter installs).
Online calculators cannot see your flashing, framing, or trim. Our free in-home estimate gives you exact per-window pricing, honest phasing advice, and financing options — with zero obligation and zero pressure. That is how we have done it since 1975.
Ready for honest answers about your windows, doors, or glass? Schedule a free in-home estimate with our award-winning team. Call us in the Tri-Cities at (509) 586-1177, in Walla Walla at (509) 529-5110, or request your free estimate online.